The Challenge
- Tight deadlines on two simultaneous projects
- Class-3 accuracy required, but fieldwork was slow and costly
- High risk of cost overruns near cost-per-passing thresholds
The Results
- 75% reduction in cost to produce reliable estimates
- 100% increase in addressable market identified
- Near Class-2 accuracy at <25% the cost of internal Class-3 estimates
- Projects delivered ahead of schedule
See how Construction Insights helps providers de-risk investments, uncover opportunity, and move faster with confidence. Download the Case Study Below